Reduce sourcing time on multi-vendor projects
One normalized RFQ across suppliers replaces individually calling and comparing four separate quotes.
Sunhub for your business
Source faster, hold less inventory, and keep every project moving, with competitive quotes, flexible terms and delivery timed to when crews actually need it.

One RFQ across every verified supplier, Net-30/60 that follows you, and JIT delivery timed to the job site.
One normalized RFQ across suppliers replaces individually calling and comparing four separate quotes.
Carrying less standing inventory, backed by fast replenishment, means less cash tied up in a warehouse shelf.
Landed cost and real lead times back up a bid instead of a rough estimate that erodes margin later.

Vetted components managed without chasing four reps for one bill of materials, comparing pricing and availability from one place.
Pricing and availability compare across a nationwide supplier network from a single search, replacing the multi-call routine of checking with four different reps for the same bill of materials.
Business registration, licensing and insurance get checked before a supplier is eligible to list, so a price comparison isn't also a trust gamble.
Sourcing here works alongside an installer's existing distributor relationships, useful for price benchmarking, backordered items and overflow sourcing rather than requiring a full switch.
One search compares pricing and availability across suppliers instead of separate calls to each one.
Sourcing here supplements a distributor relationship an installer already trusts, rather than requiring a full switch.

Reorder by kit or project with drop-ship and quick delivery, so crews never idle waiting on parts.
A saved kit or project bill of materials reorders as one action instead of rebuilding a parts list from scratch every time a crew runs short.
Replenishment orders ship directly to a job site or yard, cutting the extra step of routing through a central warehouse first.
Replenishment turnaround targets the same day or next day a crew actually needs the parts, not a standard shipping timeline built for non-urgent restocking.
Saved kits and project templates replace rebuilding a bill of materials from scratch.
Fast drop-ship delivery closes the gap between running short and getting resupplied.

Quotes on complex or large bills of materials, compared on normalized landed cost across suppliers instead of four differently formatted proposals.
A full project bill of materials, panels through BOS, posts once and reaches every relevant supplier, rather than sourcing each category through a separate search.
Responses come back structured on the same landed-cost terms, cutting through the mismatched formats and buried shipping costs that make comparing raw supplier quotes difficult.
Posting a request carries no obligation, so an installer can compare options without committing before the numbers actually work.
Normalized landed cost replaces guessing at what each supplier's quote actually includes.
One posted RFQ reaches every relevant supplier instead of a category-by-category search.

Just-in-time solar delivery to the job site, with liftgate and tight time windows scheduled around when a crew is actually ready.
Time-windowed delivery coordinates to when a crew is staged and ready to receive material, instead of a standard delivery appointment that might land a day early or late.
Most active job sites don't have a loading dock, and liftgate-equipped delivery solves the ground-level unloading problem standard freight assumes away.
Weather delays and schedule shifts are normal on active jobs, and delivery coordination here accommodates rescheduling instead of treating a shift as a failed delivery.
Delivery timing matches actual crew readiness instead of a generic freight appointment.
Liftgate and scheduled windows mean material arrives exactly when it's needed.

Apply once for Net-30 or Net-60 terms, then reuse one approved credit line across every participating supplier.
A single credit application produces terms usable across every participating supplier, instead of a fresh application and approval wait each time a new vendor relationship starts.
Credit lines revisit as order volume and payment history build, rather than staying fixed at a starting limit that no longer fits a growing installer's order sizes.
Net terms bridge the gap between paying for materials and getting paid on a completed job, which matters most for installers managing several jobs at different payment stages at once.
One approved line carries across every participating vendor relationship, cutting the paperwork that comes with each new account.
Net terms bridge the payment timing gap common to installation businesses running multiple projects at once.
Tell our team what you need, and explore the Sunhub services that fit your business.