How to run a multi-vendor RFQ, end to end
9 min read · sample
One bill of materials, comparable quotes, landed cost and lead time apples to apples.

Sunhub resources
Long-form, technical guides on procurement, design and project finance for the solar trade.

A preview of topics for this library. Downloadable resources will appear here as they become available.
9 min read · sample
One bill of materials, comparable quotes, landed cost and lead time apples to apples.

7 min read · sample
Power tolerance, temperature coefficients and degradation curves that actually matter.

11 min read · sample
Federal incentives that move a deal, adders, eligibility and the paperwork.

8 min read · sample
Right-size storage to load profile and tariff without overpaying for unused kWh.

6 min read · sample
Liftgate, accessorials and container math, the logistics that quietly decide a deal.

7 min read · sample
How to qualify, what suppliers actually check, and how to scale a credit line.

Practical sourcing guidance on comparing suppliers, reading a spec sheet and structuring a multi-vendor RFQ.
UFLPA traceability, FEOC screening and NEC 2023 requirements explained for equipment selection, not just legal reference.
Net terms, project finance and tax credit transferability mechanics, covered for how they actually apply to a deal.
Technical installation guidance, from string design to structural attachment, at the depth a design review actually needs.
A yearly look at demand, pricing and policy direction for the year ahead, flagged clearly where figures are projections.
ESG and circular-economy topics, including module recycling and supply chain traceability, covered for procurement relevance.
Guides run to whatever length the topic actually needs, not stretched to hit a word count, since a buyer using this to make a real decision doesn't need filler.
Technical installation guidance, from string design to structural attachment, at the depth a design review actually needs.

Maximum string voltage, temperature derating and NEC 690.7 requirements covered at the depth a design review actually checks, not a simplified rule of thumb.
Attachment approach for shingle, tile, metal and ground-mount systems, covered with the load and spacing considerations a structural review looks for.
Transport and on-site handling guidance that keeps micro-cracking and connector damage from voiding a manufacturer warranty before a system even goes live.
Guidance targets crews and designers who need code-level detail, not a general overview of how solar installation works.
UFLPA traceability, FEOC screening and NEC 2023 requirements explained for equipment selection.

Forced-labor prevention enforcement now reviews thousands of shipments a year, and this guide covers what full traceability to polysilicon origin actually requires to survive a review, not just the legal standard.
Prohibited foreign entity rules apply on a rising cost-ratio threshold schedule, and this guide walks through what that means for sourcing decisions made today versus a project starting construction next year.
Rapid shutdown under 690.12 and arc-fault protection under 690.11 drive specific equipment decisions, covered here at the level a design review actually needs.
Clean documentation on FEOC and UFLPA status increasingly affects tax credit eligibility and project financing, beyond the baseline legal requirement to comply.
Talk with our team about the equipment and services your business needs.